2000 Best Practice Awards


"Local" Winner
The Hazard Mitigation Control Program
Quincy's Floodplain Areas

 

Photo of 67 Edgewater Drive before construction 

Photo of 67 Edgewater Drive during construction

Hazard Mitigation Control Program
67 Edgewater Drive: Housing Retrofitting. Pictures show project before (top left), during (top right), and after (below) construction. This project elevated the entire house several feet above base flood elevation. Through the use of fill, elevated foundations, sheer walls, posts, piles and pier foundations and related insulation, plumbing, wiring, utilities and site work the structure will now be above the reaches of flood waters.

Photo of 67 Edgewater Drive after construction
   


   

 Photo of interior constuction of 59 Terne Road project

 Photo of exterior constuction of 59 Terne Road project

Hazard Mitigation Control Program
59 Terne Road: Housing Retrofitting. Pictures show the interior (above left) and exterior (above right) construction, and completion (below) of the project.This project involved the construction of a new utility room attached to the existing housing structure, where the heating system, electrical panels and appliances were installed. There was no space in the house large enough to accommodate these items.

Photo of completed project at 59 Terne Road

Return to Massachusetts Winners

Return to Best Practices 2000 Winners List

Content Archived: April 20, 2011

Whitehouse.gov
FOIA Privacy Web Policies and Important Links [logo: Fair Housing and Equal 

Opportunity]
U.S. Department of Housing and Urban Development
451 7th Street S.W.
Washington, DC 20410
Telephone: (202) 708-1112 TTY: (202) 708-1455
usa.gov